Manfaat Repetitive Project Modeling (RPM) Pada Penjadwalan Pekerjaan Pembangunan Jembatan

-, Armeyn (2003) Manfaat Repetitive Project Modeling (RPM) Pada Penjadwalan Pekerjaan Pembangunan Jembatan. Jurnal R & B, 3 (1). pp. 19-26. ISSN 1412-5080

[img]
Preview
PDF
455Kb

Official URL: http://www.polinpdg.ac.id

Abstract

For scheduling the repetitive work in the structure of multistory bridge the tradisional methods like bar chart and network planning is still used. Repetitive project modeling (RPM) which it’s effectiveness for road, piping, work, and high way and brige has been analyzed, can be used for scheduling the structure work with concerning the “interdependency relationship” characteristic between the sub-network activities. Beside that RPM gives advantages to the project performance.

Item Type:Article
Subjects:G Technology > GA Engineering (General). Civil engineering (General)
Divisions:Jurusan Teknik Sipil > Prog.Studi Teknik Sipil-D3 > Jurnal/Karya Ilmiah
ID Code:126
Deposited By:Mr. OP Repo-4 Puskom
Deposited On:06 Oct 2016 11:17
Last Modified:09 Nov 2016 11:07

Repository Staff Only: item control page