ANALISIS FAKTOR-FAKTOR PENYEBAB PERBEDAAN ESTIMASI BIAYA AWAL DENGAN BIAYA PELAKSANAAN PROYEK KONSTRUKSI DI LINGKUNGAN KAMPUS POLITEKNIK NEGERI PADANG

Natalia, Monika and Partawijaya, Yan and -, Satwarnirat and Hidayati, Rahmi and -, Hartati (2015) ANALISIS FAKTOR-FAKTOR PENYEBAB PERBEDAAN ESTIMASI BIAYA AWAL DENGAN BIAYA PELAKSANAAN PROYEK KONSTRUKSI DI LINGKUNGAN KAMPUS POLITEKNIK NEGERI PADANG. POLI REKAYASA, 12 (1). pp. 21-31. ISSN 1858-3695

[img]
Preview
PDF
329Kb

Official URL: http://www.polinpdg.ac.id

Abstract

The difference preliminary cost estimate often do so at the cost of implementation of construction projects. Likewise with construction projects in the country Polytechnic Padang. The research that has been conducted found that the factors that cause differences in the cost of government policies change often with a contribution of 2.221%, 1.487% of the project schedule, a change of plans for the implementation of the project amounted to 1.098%, 1.036 criteria for project drawings %, review the design of 0.955%, the first disbursement of funds are not clear 0.850%, the processes of implementation on the ground of 0.720%, rising material prices rising by 0.614% and 0.550% of wages.

Item Type:Article
Subjects:G Technology > GA Engineering (General). Civil engineering (General)
Divisions:Jurusan Teknik Sipil > Prog.Studi Teknik Sipil-D3 > Jurnal/Karya Ilmiah
ID Code:202
Deposited By:Mr. OP Repo-2 Puskom
Deposited On:11 Oct 2016 09:11
Last Modified:09 Nov 2016 14:16

Repository Staff Only: item control page