Perbandingan Perhitungan Rencana Anggaran Biaya Cara Manual Dengan Menggunakan Software Winest (Studi Kasus Pada Proyek Peningkatan Politeknik Negeri Padang)

Roza Syofyan, Elvi and -, Munafri (2004) Perbandingan Perhitungan Rencana Anggaran Biaya Cara Manual Dengan Menggunakan Software Winest (Studi Kasus Pada Proyek Peningkatan Politeknik Negeri Padang). Jurnal R & B, 4 (2). pp. 11-20. ISSN 1412-5080

[img]
Preview
PDF
470Kb

Official URL: http://www.polinpdg.ac.id

Abstract

In executing a project, required to planning budget of its, in order not to happened loss in doing a project. Budget planning is way to estimate to the number of needed to expenses like fee and materials and also other costs related to execution a project or is a plan totally from all activity that happened in project. There are many software can be used for cost estimate a project construction like : Microsoft Project, Primavera, etc. but based on experience many engineers more prefer to use WinEst that other software. This research aim to for compare of calculation budget plan way of manual by using Microsoft Exel / Lotus 123 with WinEst software, which is application at one particular work of development in civil workshop building at polytechnic State Project Improvement. Result of calculation of budget plan by manual (Exel) and use Software WinEst show that no difference meaning. The result showed that Analyzed the budget using Winest program is faster and more accurate than manual system, because in the WinEst program there is fix formula to calculate the work volume.

Item Type:Article
Subjects:F Science > FA Mathematics > FA2 Computer software
Divisions:Jurusan Teknik Sipil > Prog.Studi Teknik Sipil-D3 > Jurnal/Karya Ilmiah
ID Code:208
Deposited By:Mr. OP Repo-4 Puskom
Deposited On:11 Oct 2016 09:55
Last Modified:09 Nov 2016 11:22

Repository Staff Only: item control page